{"id":581,"date":"2022-04-26T08:00:12","date_gmt":"2022-04-26T08:00:12","guid":{"rendered":"https:\/\/capeelectric.in\/blog\/?p=581"},"modified":"2024-04-23T06:28:04","modified_gmt":"2024-04-23T06:28:04","slug":"10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations","status":"publish","type":"post","link":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/","title":{"rendered":"10 important (generally neglected) points to ensure electrical safety in LV installations"},"content":{"rendered":"<div class=\"OFA52E\">\n<div class=\"cD_92h UitnHM\" tabindex=\"-1\" data-hook=\"post-title\">\n<h1 class=\"UbhFJ7 nkqC0Q blog-post-title-font blog-post-title-color blog-text-color post-title blog-hover-container-element-color FG3qXk blog-post-page-title-font\" data-hook=\"post-title\"><span class=\"post-title__text blog-post-title-font blog-post-title-color\"><span class=\"blog-post-title-font blog-post-title-color\">10 important (generally neglected) points to ensure electrical safety in LV installations<\/span><\/span><\/h1>\n<\/div>\n<\/div>\n<div class=\"nLG8d5\" data-hook=\"post-description\">\n<article class=\"blog-post-page-font\">\n<div class=\"post-content__body\">\n<div class=\"moHCnT\">\n<div class=\"moHCnT\">\n<div class=\"fTEXDR A2sIZ4 QEEfz0\" data-rce-version=\"9.14.8\">\n<div class=\"itVXy dojW8l s6hjqn _8a1b4\" dir=\"ltr\" data-id=\"rich-content-viewer\">\n<div class=\"mhGZq BAGeNT\">\n<h2 id=\"viewer-foo\" class=\"xVISr Y9Dpf bCMSCT OZy-3 _40ACk Ecq9kg bCMSCT public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Electrical Safety and Fire due to Short Circuit<\/span><\/h2>\n<p id=\"viewer-bps3q\" class=\"xVISr Y9Dpf bCMSCT OZy-3 _40ACk Ecq9kg bCMSCT public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Electrocution and fire due to short circuit are common in our electrical installation in residential, Commercial, and Industrial premise. Annually about 1000 people and property worth 1000\u2019s of crores of rupees is being lost due to these accidents.<\/span><\/p>\n<div data-hook=\"rcv-block4\"><\/div>\n<p id=\"viewer-9vvl4\" class=\"xVISr Y9Dpf bCMSCT OZy-3 _40ACk Ecq9kg bCMSCT public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">The webinar explains 10 most important electrical safety methods to be adopted in a low voltage electrical installation in order to avoid accidents from the wiring and usage of electricity, including SOLAR PV and Electric Vehicles.<\/span><\/p>\n<div data-hook=\"rcv-block6\"><\/div>\n<p id=\"viewer-b6o9s\" class=\"xVISr Y9Dpf bCMSCT OZy-3 lnyWN yMZv8w bCMSCT public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">The webinar was participated by &gt;200 engineers, including Shri V Suresh, Vice chairman of National Building Code, Shri Bhavani Prasad, Director General (Retd.) of CPWD and many more important personalities.<\/span><\/p>\n<h4 data-hook=\"rcv-block8\"><\/h4>\n<h4 id=\"viewer-b6vte\" class=\"xVISr Y9Dpf bCMSCT OZy-3 lnyWN yMZv8w bCMSCT public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Video of the webinar Introduction<\/span><\/h4>\n<div id=\"viewer-dk2\" class=\"QHjDE rzoRKE\">\n<div class=\"gO6aa y8JqQg y8JqQg flaqF\">\n<div class=\"cZYzi pScSGT\">\n<div tabindex=\"0\" data-hook=\"reactPlayerWrapper\">\n<div class=\"_1IUhX\" data-loaded=\"true\">\n<div><center><iframe id=\"widget26\" title=\"10 important (generally neglected) points to ensure electrical safety in LV installations\" src=\"https:\/\/www.youtube.com\/embed\/kO_iSt4OnMs?autoplay=0&amp;mute=0&amp;controls=1&amp;origin=https%3A%2F%2Fcapedigital.wixsite.com&amp;playsinline=1&amp;showinfo=0&amp;rel=0&amp;iv_load_policy=3&amp;modestbranding=1&amp;enablejsapi=1&amp;widgetid=25\" width=\"100%\" height=\"415\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\" data-mce-fragment=\"1\"><span data-mce-type=\"bookmark\" style=\"display: inline-block; width: 0px; overflow: hidden; line-height: 0;\" class=\"mce_SELRES_start\">\ufeff<\/span><\/iframe><\/center><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h4 data-hook=\"rcv-block11\"><\/h4>\n<h4 id=\"viewer-f02m3\" class=\"xVISr Y9Dpf bCMSCT OZy-3 lnyWN yMZv8w bCMSCT public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Video of the webinar main presentation<\/span><\/h4>\n<div id=\"viewer-dpdv0\" class=\"QHjDE rzoRKE\">\n<div class=\"gO6aa y8JqQg y8JqQg flaqF\">\n<div class=\"cZYzi pScSGT\">\n<div tabindex=\"0\" data-hook=\"reactPlayerWrapper\">\n<div class=\"_1IUhX\" data-loaded=\"true\">\n<div><center><iframe id=\"widget28\" title=\"10 important (generally neglected) points to ensure electrical safety in LV installations\" src=\"https:\/\/www.youtube.com\/embed\/HiCinGboHHE?autoplay=0&amp;mute=0&amp;controls=1&amp;origin=https%3A%2F%2Fcapedigital.wixsite.com&amp;playsinline=1&amp;showinfo=0&amp;rel=0&amp;iv_load_policy=3&amp;modestbranding=1&amp;enablejsapi=1&amp;widgetid=27\" width=\"100%\" height=\"415\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\" data-mce-fragment=\"1\"><span data-mce-type=\"bookmark\" style=\"display: inline-block; width: 0px; overflow: hidden; line-height: 0;\" class=\"mce_SELRES_start\">\ufeff<\/span><\/iframe><\/center><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div data-hook=\"rcv-block14\"><\/div>\n<h4 id=\"viewer-59o3p\" class=\"xVISr Y9Dpf bCMSCT OZy-3 lnyWN yMZv8w bCMSCT public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Video of the webinar Q&amp;A<\/span><\/h4>\n<div id=\"viewer-883mj\" class=\"QHjDE rzoRKE\">\n<div class=\"gO6aa y8JqQg y8JqQg flaqF\">\n<div class=\"cZYzi pScSGT\">\n<div tabindex=\"0\" data-hook=\"reactPlayerWrapper\">\n<div class=\"_1IUhX\" data-loaded=\"true\">\n<div><center><iframe id=\"widget30\" title=\"10 important (generally neglected) points to ensure electrical safety in LV installations q&amp;a\" src=\"https:\/\/www.youtube.com\/embed\/nXBgJozarX4?autoplay=0&amp;mute=0&amp;controls=1&amp;origin=https%3A%2F%2Fcapedigital.wixsite.com&amp;playsinline=1&amp;showinfo=0&amp;rel=0&amp;iv_load_policy=3&amp;modestbranding=1&amp;enablejsapi=1&amp;widgetid=29\" width=\"100%\" height=\"415\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\" data-mce-fragment=\"1\"><\/iframe><\/center><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h4 id=\"viewer-aq9lf\" class=\"xVISr Y9Dpf bCMSCT OZy-3 lnyWN yMZv8w bCMSCT public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><strong>Frequently asked questions on Electrical Safety in LV Installations<\/strong><\/h4>\n<div id=\"viewer-60bpn\" class=\"QHjDE rzoRKE\">\n<div class=\"VcB4o\">\n<div class=\"x0rQE\">\n<div id=\"viewer-60bpn\" class=\"QHjDE rzoRKE\">\n<div class=\"VcB4o\">\n<div class=\"x0rQE\">\n<table class=\"okQLv\" style=\"height: 5229px;\" width=\"996\">\n<colgroup>\n<col \/>\n<col \/><\/colgroup>\n<thead><\/thead>\n<tbody>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<h4 id=\"viewer-nrowwmg38\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><strong><span class=\"B2EFF public-DraftStyleDefault-ltr\">Question<\/span><\/strong><\/h4>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<h4 id=\"viewer-gdsqfx6hn\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><strong><span class=\"B2EFF public-DraftStyleDefault-ltr\">Answer<\/span><\/strong><\/h4>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-wvhidjxyz\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Faults and failure in Electric Safety and related fire safety &#8211; is it due to : 1. use of substandard electrical materials and appliances; 2.unsafe poor quality installation practices 3. lack of skilled trained certified work force or electricians or 4. lack of in depth supervision?<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-zj8z6wejp\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">All the four contribute in a general scenario. How ever in an industrial and commercial building, the use of substandard products are less, where as wrong installation practices are more. (in fact installation and safety standards are not followed)<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-gw0ruip5h\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Do you feel there is lack of full in depth awareness of all regulations under CEA by practitioners?<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-zn5riyqcj\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">YES<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-m4diawvty\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">\u200bwould it be desirable to license the practitioners for compliance capabilities and capacities? <\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-eyou85kcn\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Yes. The state governments are yet to implement Chartered Electrical Safety Engineers, which is included in the regulation in 2015.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-axuaeni4n\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Is there laxity in electrical inspection and enforcement from electrical inspectorate? Is is capacity constraints in EI team ? <\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-hj86m4b8q\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Electrical Inspectorates can not make the tests as per IS732. Inspectorates shall regularise chartered electrical safety engineer to handle this massive job.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-xkcv74z7p\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Do you have annual\/periodic inspections and audit in existing buildings with full occupancy and electrical load <\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-87aeo78cu\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Yes We do it as per IS732 (IEC 60364-6) and National Electrical Code of India<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-fkbdadmp0\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">The exposed live electrical wires in the buildings and ducts pose danger??<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-t554j4g0q\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Yes, if they are accessible.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-xszeji4fj\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">lightning protection is an important element in tall Buildings and Towers&#8211; How are provisions in NBC and NEC and IER to deal with this? are these compliant with latest IEC \/global norms? Is this being monitored or audited by electrical practitioners\/ enforced by Electrical Inspectorate?<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-op2thfpdi\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">LPS as per NBC is confirming to the latest global standard IEC 62305. Regulations recommend to carryout LPS as per code of practices of BIS. How ever non standard LPS (such as ESE\/DAS) are more installed due tot he lack of awareness in the subject.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-miapzdcol\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">what is electric insulation coating.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-1tls56k8v\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">coating (of insulating paint or resin) in floor in order to avoid shock (increase floor resistance)<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-67fgfnola\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">What is RCD test<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-n7odkqj0w\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Testing of the disconnection time and disconnection current of an RCD with a RCD test meter.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-se5te628h\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">How to take care of electrical meter fire. In our building transformer outlet comes to a bus bar &amp; an Isolator having fuses. Meter &amp; upstream belongs to Maharashtra Electricity and downstream belongs to society. Meter was changed &amp; working fine showing no problem on downstream side.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-nw4h0godk\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Probably due to insulation failure in meter. If the meter is installed before the incoming fuse, it is a problem. If the meter is after fuse, then the fuse is supposed to disconnect before the meter catches fire. Ask the utility company to verify.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-mm6h68cmf\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Still we have to go for plate earthing for neutral earth or is there any advanced earthing now.<\/span><\/p>\n<div id=\"viewer-gisg\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">\u00a0<\/span><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-n5nrv2z0n\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">You have to implement a TN-S system in your factory, where plate or rod is not important.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-b1wlp8irz\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Can we use copper rod earthing for neutral.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-sl5mpj0da\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">The question is about the concept two for neutral (copper), two for body (GI). This concept itself do not exist and is wrong<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-9piyrrim2\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">33kv cable punctured?? lv side load was only 300amps. then what can be the reason for cable puncture on the HT side? is it due to earthing issues?<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-ny9tm618r\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">\u200bInsulation failures are due to reasons related to voltage. (if there is no mechanical reason) In an unearthed system over voltages will be higher as a result higher insulation is necessary.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-znc0j657u\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Kindly forward technical slides regarding fault current calculation<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-cfr6ams3r\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Sorry, we don&#8217;t share any slides. You have to refer video of the program<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-54rfu3il1\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">We are eager to understand earthing \/ bounding requirement for Solar PV system, request to put some light on this, if possible.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-1om4mh9jr\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Sorry due to time constraint, we could not cover it today. we will do it in the next webinar.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-ou1vyqxey\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">After 12 years is there a necessity to revamp earth pits&#8230;like replacing chemical earthing and plate earthing.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-wm9bhw83i\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">\u200bPlease carry out a test and decide<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-c1f4inmew\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Do the Electrical Inspectors have the Power to Overcome or Byepass the Indian standards and take any decision to alter the installation for the purpose of ensuring safety??<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-fibmsngt1\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">NO. They are supposed to follow CEA safety regulation. They can not violate regulation and standards.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-rmag48fjc\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\"> briefly explain about fault loop impedancee.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-qy2hpxidy\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">\u200bThe impedance of the earth fault current loop (phase to earth loop)<\/span><\/p>\n<p id=\"viewer-3taor\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">starting and ending at the point of earth fault. This impedance is denoted by the symbol Z. The earth fault loop comprises the following, starting at the point of fault:<\/span><\/p>\n<p id=\"viewer-80vgl\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">a) the circuit protective conductor;<\/span><\/p>\n<p id=\"viewer-b91g2\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">b) the consumer\u2019s earthing terminal and earthing conductor, and for TN systems, the metallic return path;<\/span><\/p>\n<p id=\"viewer-ssa3\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">c) for TT and IT systems, the earth return path;<\/span><\/p>\n<p id=\"viewer-b0prc\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">d) the path through the earth neutral point of the transformer;<\/span><\/p>\n<p id=\"viewer-9baq6\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">e) the transformer winding; and<\/span><\/p>\n<p id=\"viewer-700qf\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">f) the line conductor from the transformer to the point of fault.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-dxu6ffx1t\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Why TNS is suitable for Data Centre Buildings. Since there are multiple Trafo and DG in data center Buildings, a Lot of neutral pits (2 per neutral) by code and dedicated Network Earthing will be there. this will increase the number of pits to 200 pits. <\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-7gx7g1txk\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Multiple Transformer and DG in a small area is the reason for implementing TN-S system. You can not implement TT in such applications and is illegal according to the regulation and standards in India.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-d2ketabq2\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">What should be the earth resistance of an earth pit, is it different for different applications<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-qitrywql3\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">For TT system earth electrode is mandatory. The IS code says if you use 30 mA RCD, the earth electrode resistance can be up to 1666 ohms<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-f8l99k7pq\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">How do identify class2 and class 5 wires? what in the case of ALAR cables of higher size&#8230;is there any standard that only certain class cables to be used.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-8fa6ftvlp\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Pl check the documents of the manufacturer.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-ejv24d6gl\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Which standard applies to the limitations on Neutral current due to triplent order? Limiting the neutral current at the feeder level, rather than installing a K-rated transformer, will considerably prevent fire accidents, in my opinion. A dangerous situation is when the neutral is disconnected due to a high current.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-cgtkjhj60\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">There are two points in the question. In order to achieve safety once when the neutral is over loaded, it shall be sensed and line conductor shall be disconnected. Never disconnect Neutral first.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-9kvfdp7j2\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Are the annual electrical inspections conducted by CEIG &#8211; a sample inspection or expected to be exhaustive inspection of all common electrical installations especially in hi rise buildings\/ apartment complexes<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-rk88q31gm\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">CEIG will only make an over all inspection. The tests in the standards shall be carried out by the owner with the help of chartered electrical safety engineer.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-c8mt6adgp\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">\u200bHow to withstand RCCB in existing hospital installation having UPS &amp; inverters &amp; load on UPS &amp; inverters is supplied with common Electricity board neutral. instead of separate neutral for UPS load.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-bs98o8pmd\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Sharing common neutral is illegal and against safety rules. please refer IS732, clause 4.5<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-mb3uu1aab\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Is there any difference between earthing and grounding?<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-dqt86q8n7\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">NO. Both are same. Grounding is used in USA. Earthing shall be used in India<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-t6dst3i5l\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">It is reported that in Mumbai, almost 70% fires are related to improper wiring and short circuits and 39% of the installed fire systems are dysfunctional.<\/span><\/p>\n<p id=\"viewer-bdoq6\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">So we have a double whammy.<\/span><\/p>\n<div id=\"viewer-dcg9m\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">\u00a0<\/span><\/div>\n<p id=\"viewer-2l7kj\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">The MFB CFO, has suggested that Joint audit by the fire auditor and electrical safety inspector is important. <\/span><\/p>\n<p id=\"viewer-a2cm\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Given the acute paucity of competent electrical safety inspectors ,what is the solution.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-s4xb6933v\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Conduct electrical safety audits as per IS 732. Cape have trained engineers to carryout this.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-engqyes1v\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">in our building we have 40 yrs old of electrical wiring .can you explain is this necessary to rework of each and every elecrtical lines??<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-5lcavao3o\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Conduct electrical safety audits as per IS 732, based on the result you can decide. Cape have trained engineers to carryout this.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-arnb9tmta\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">If distribution box have 16 Amp MCB and overcurrent occurred almost 40 Amp. But why are the cause for MCB does not trip? although MCB is good condition.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-p4i6nsz67\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Check the type of MCB and find out the disconnection current and time. If its not disconnecting, replace it.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-x7hedhl6f\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">\u200bfault loop impedance can be done for source LT panels to determine ACB protection.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-mrvu7fzj4\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Preferably do it for the final circuits, but test can be carried out anywhere in a circuit<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-gsmxij9i2\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">which equipment is advised to protect against TOV?<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-5v6x86ukj\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Proper implementation of system earthing such as TN-S, TT etc and decide how HT earthing is carried out.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-bf51edlgq\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">As per NEC 2011 , for good earthing, the earthing value is should be less than 5 Ohms for low voltage systems. But, here in Amravati Maharashtra the electrical inspectorate is asking for earthing value lesser than 2 Ohms. Can you tell us what value is considered sufficient for 433 V systems?<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-w5iiskl77\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">for 433 volt system, earth electrode resistance of both 5 or 2 ohms is not necessary. Try to implement protective equipotential bonding in your building, if it do not exist.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-n3fiizdqh\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">In the market the chemical earthing is considered as maintenance free method of earthing. But, our measurements suggest that, the value changes substantially as the time passes. Can you tell us what type of earthing is necessary for low voltage systems?<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-7uy1u5nvk\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">TN-S earthing is recommended. Earth electrode and chemicals are immaterial.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<tr>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-m2o4rdha9\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">For temporary unit set up at such as construction work, DG 125KVA using for getting power, How can we prepare earthing to get in &lt;1 ohm, Soil is Dry land such as sandy area (desert), we always getting 3 ohms only. Any solution for this??<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<td class=\"-yfd8\" colspan=\"1\" rowspan=\"1\" data-hook=\"table-plugin-cell\">\n<div class=\"bLarR Xg7Y3\">\n<div class=\"fMrCg p9bIe\">\n<div class=\"itVXy _8a1b4\" dir=\"ltr\">\n<div class=\"mhGZq UMsJ3 EjYv0 cv0sq\">\n<p id=\"viewer-qmb350iee\" class=\"xVISr Y9Dpf OZy-3 lnyWN public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><span class=\"B2EFF public-DraftStyleDefault-ltr\">Neither 3 ohm nor 1 ohm is going to help you. Install an RCD of 30 mA in the main switch board. earth electrode value can be even as high as 25 ohms.<\/span><\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"\"><\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<\/div>\n<div data-hook=\"rcv-block19\">To learn more about Electrical Safety, please click the link: <a href=\"https:\/\/capeelectric.in\/electrical-safety\">https:\/\/capeelectric.in\/electrical-safety<\/a><\/div>\n<div id=\"viewer-4n8ug\" class=\"xVISr Y9Dpf bCMSCT OZy-3 lnyWN yMZv8w bCMSCT public-DraftStyleDefault-block-depth0 fixed-tab-size public-DraftStyleDefault-text-ltr\"><\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/article>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>10 important (generally neglected) points to ensure electrical safety in LV installations Electrical Safety and Fire due to Short Circuit Electrocution and fire due to short circuit are common in our electrical installation in residential, Commercial, and Industrial premise. Annually about 1000 people and property worth 1000\u2019s of crores of rupees is being lost due to these accidents. The webinar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":703,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"video","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-581","post","type-post","status-publish","format-video","has-post-thumbnail","hentry","category-uncategorized","post_format-post-format-video"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\r\n<title>10 Electrical Safety Tips to Prevent Accidents in LV Installations<\/title>\r\n<meta name=\"description\" content=\"Stay safe with these electrical safety tips for low-voltage installations. Protect your property from dangerous fires and electrical hazards.\" \/>\r\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\r\n<link rel=\"canonical\" href=\"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/\" \/>\r\n<meta property=\"og:locale\" content=\"en_US\" \/>\r\n<meta property=\"og:type\" content=\"article\" \/>\r\n<meta property=\"og:title\" content=\"10 Electrical Safety Tips to Prevent Accidents in LV Installations\" \/>\r\n<meta property=\"og:description\" content=\"Stay safe with these electrical safety tips for low-voltage installations. Protect your property from dangerous fires and electrical hazards.\" \/>\r\n<meta property=\"og:url\" content=\"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/\" \/>\r\n<meta property=\"og:site_name\" content=\"Cape Electric\" \/>\r\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/capeelectric\" \/>\r\n<meta property=\"article:published_time\" content=\"2022-04-26T08:00:12+00:00\" \/>\r\n<meta property=\"article:modified_time\" content=\"2024-04-23T06:28:04+00:00\" \/>\r\n<meta property=\"og:image\" content=\"https:\/\/www.capeelectric.in\/blog\/wp-content\/uploads\/2022\/04\/hqdefault-1.jpg\" \/>\r\n\t<meta property=\"og:image:width\" content=\"480\" \/>\r\n\t<meta property=\"og:image:height\" content=\"360\" \/>\r\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\r\n<meta name=\"author\" content=\"admin\" \/>\r\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\r\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\r\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/#\\\/schema\\\/person\\\/38a5e49baa70640241a895595d0e9479\"},\"headline\":\"10 important (generally neglected) points to ensure electrical safety in LV installations\",\"datePublished\":\"2022-04-26T08:00:12+00:00\",\"dateModified\":\"2024-04-23T06:28:04+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/\"},\"wordCount\":1772,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hqdefault-1.jpg\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/\",\"url\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/\",\"name\":\"10 Electrical Safety Tips to Prevent Accidents in LV Installations\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hqdefault-1.jpg\",\"datePublished\":\"2022-04-26T08:00:12+00:00\",\"dateModified\":\"2024-04-23T06:28:04+00:00\",\"description\":\"Stay safe with these electrical safety tips for low-voltage installations. Protect your property from dangerous fires and electrical hazards.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hqdefault-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/hqdefault-1.jpg\",\"width\":480,\"height\":360},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"10 important (generally neglected) points to ensure electrical safety in LV installations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/#website\",\"url\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/\",\"name\":\"Cape Electric\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/#organization\",\"name\":\"Cape Electric\",\"url\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/capeelectric.in\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/logo.png\",\"contentUrl\":\"https:\\\/\\\/capeelectric.in\\\/blog\\\/wp-content\\\/uploads\\\/2023\\\/11\\\/logo.png\",\"width\":250,\"height\":108,\"caption\":\"Cape Electric\"},\"image\":{\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/capeelectric\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/#\\\/schema\\\/person\\\/38a5e49baa70640241a895595d0e9479\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4a3112c8a592b10b8112a3e5f0bd042bdbb35c585d88e9d3e60c607346cc2acf?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4a3112c8a592b10b8112a3e5f0bd042bdbb35c585d88e9d3e60c607346cc2acf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/4a3112c8a592b10b8112a3e5f0bd042bdbb35c585d88e9d3e60c607346cc2acf?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"sameAs\":[\"https:\\\/\\\/capeelectric.in\\\/blog\"],\"url\":\"https:\\\/\\\/www.capeelectric.in\\\/blog\\\/author\\\/mwscape_5d5stdx9\\\/\"}]}<\/script>\r\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"10 Electrical Safety Tips to Prevent Accidents in LV Installations","description":"Stay safe with these electrical safety tips for low-voltage installations. Protect your property from dangerous fires and electrical hazards.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/","og_locale":"en_US","og_type":"article","og_title":"10 Electrical Safety Tips to Prevent Accidents in LV Installations","og_description":"Stay safe with these electrical safety tips for low-voltage installations. Protect your property from dangerous fires and electrical hazards.","og_url":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/","og_site_name":"Cape Electric","article_publisher":"https:\/\/www.facebook.com\/capeelectric","article_published_time":"2022-04-26T08:00:12+00:00","article_modified_time":"2024-04-23T06:28:04+00:00","og_image":[{"width":480,"height":360,"url":"https:\/\/www.capeelectric.in\/blog\/wp-content\/uploads\/2022\/04\/hqdefault-1.jpg","type":"image\/jpeg"}],"author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/#article","isPartOf":{"@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/"},"author":{"name":"admin","@id":"https:\/\/www.capeelectric.in\/blog\/#\/schema\/person\/38a5e49baa70640241a895595d0e9479"},"headline":"10 important (generally neglected) points to ensure electrical safety in LV installations","datePublished":"2022-04-26T08:00:12+00:00","dateModified":"2024-04-23T06:28:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/"},"wordCount":1772,"commentCount":0,"publisher":{"@id":"https:\/\/www.capeelectric.in\/blog\/#organization"},"image":{"@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.capeelectric.in\/blog\/wp-content\/uploads\/2022\/04\/hqdefault-1.jpg","inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/","url":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/","name":"10 Electrical Safety Tips to Prevent Accidents in LV Installations","isPartOf":{"@id":"https:\/\/www.capeelectric.in\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/#primaryimage"},"image":{"@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.capeelectric.in\/blog\/wp-content\/uploads\/2022\/04\/hqdefault-1.jpg","datePublished":"2022-04-26T08:00:12+00:00","dateModified":"2024-04-23T06:28:04+00:00","description":"Stay safe with these electrical safety tips for low-voltage installations. Protect your property from dangerous fires and electrical hazards.","breadcrumb":{"@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/#primaryimage","url":"https:\/\/www.capeelectric.in\/blog\/wp-content\/uploads\/2022\/04\/hqdefault-1.jpg","contentUrl":"https:\/\/www.capeelectric.in\/blog\/wp-content\/uploads\/2022\/04\/hqdefault-1.jpg","width":480,"height":360},{"@type":"BreadcrumbList","@id":"https:\/\/www.capeelectric.in\/blog\/10-important-generally-neglected-points-to-ensure-electrical-safety-in-lv-installations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.capeelectric.in\/blog\/"},{"@type":"ListItem","position":2,"name":"10 important (generally neglected) points to ensure electrical safety in LV installations"}]},{"@type":"WebSite","@id":"https:\/\/www.capeelectric.in\/blog\/#website","url":"https:\/\/www.capeelectric.in\/blog\/","name":"Cape Electric","description":"","publisher":{"@id":"https:\/\/www.capeelectric.in\/blog\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.capeelectric.in\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.capeelectric.in\/blog\/#organization","name":"Cape Electric","url":"https:\/\/www.capeelectric.in\/blog\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.capeelectric.in\/blog\/#\/schema\/logo\/image\/","url":"https:\/\/capeelectric.in\/blog\/wp-content\/uploads\/2023\/11\/logo.png","contentUrl":"https:\/\/capeelectric.in\/blog\/wp-content\/uploads\/2023\/11\/logo.png","width":250,"height":108,"caption":"Cape Electric"},"image":{"@id":"https:\/\/www.capeelectric.in\/blog\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/capeelectric"]},{"@type":"Person","@id":"https:\/\/www.capeelectric.in\/blog\/#\/schema\/person\/38a5e49baa70640241a895595d0e9479","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/4a3112c8a592b10b8112a3e5f0bd042bdbb35c585d88e9d3e60c607346cc2acf?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/4a3112c8a592b10b8112a3e5f0bd042bdbb35c585d88e9d3e60c607346cc2acf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/4a3112c8a592b10b8112a3e5f0bd042bdbb35c585d88e9d3e60c607346cc2acf?s=96&d=mm&r=g","caption":"admin"},"sameAs":["https:\/\/capeelectric.in\/blog"],"url":"https:\/\/www.capeelectric.in\/blog\/author\/mwscape_5d5stdx9\/"}]}},"_links":{"self":[{"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/posts\/581","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/comments?post=581"}],"version-history":[{"count":7,"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/posts\/581\/revisions"}],"predecessor-version":[{"id":920,"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/posts\/581\/revisions\/920"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/media\/703"}],"wp:attachment":[{"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/media?parent=581"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/categories?post=581"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.capeelectric.in\/blog\/wp-json\/wp\/v2\/tags?post=581"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}